Company Letter Head

PRECAST LIFTING DESIGN - REINFORCEMENT BAR ANCHOR (EC2 / EC3)

One U-shaped rebar hook (2 legs) - SS EN 1992-1-1 and SS EN 1993-1-1


Materials

N/mm² (ribbed bar)
mm
N/mm²

Select the concrete strength reached when the element is lifted, not the 28-day class, if lifting is earlier. Bond condition to EC2 cl. 8.4.2(2), Fig. 8.2 - depends on the position of the legs during concreting. Use "Poor" if in doubt.

Hook Geometry

Rebar lifting hook concrete vertical PR β1 h1 b1 ELEVATION leg 1 leg 2 line joining the two legs Ph β2 Ph,y Ph,x PLAN
mm
mm

h1 is measured from the concrete surface to the point where the sling bears on the hook.

Sling Angles

degrees
degrees

β1 = 0: straight vertical lift. β2 = 0: sling leans along the line of the legs (in the plane of the hook). β2 = 90: sling leans square to the hook, which bends the legs. β1 above 60 is outside normal sling practice and gives a warning.

Applied Force (Ultimate)

kN

The force is per hook and must already include the load factor and any dynamic or demoulding (suction) factor.