Design UBC Splice by welding


Project Title    

Design Code,       Design Yield Strength,   N/mm2     Loadings,     LLcrane,   tons    
Span between crane rails (see diagram above), L1 = m     Wt of crane supporting crab, W1 = kN     Wt of crane crab, Wcrab = kN    

Minimum hook approach, xmin =   m     Carriage wheel spacing, Lwheel = m     Span of crane beam, Lcrane_beam = m    
Wt of crane beam, Wtcrane_beam = kg/m    


barblue.gif (11170 bytes)

HOME

NEW CRANE LOADINGS

REDO INPUT

TOP

rys.com.sg is a product of RYS Consultants Pte Ltd. e-mail: rys3003@gmail.com

TOP.gif (2088 bytes)

Copyright 2013-2017 RYS Consultants Pte Ltd